  Phantom Hills Water System

Phantom Hills

Phantom Hills Golf

WGM Group provided planning, cost analysis, permitting, design, and construction administration for this new public water supply. This system serves a 365-lot residential neighborhood and an 18-hole golf course.

The project included groundwater analyses and preparation of the Department of Environmental Quality PWS-6 report requiring the determination of the three-year time of travel for the groundwater. A continuously running booster pump was designed to pressurize the system to overcome the lack of elevation change across the site.