|
|
||
Projects
|
39th Street / Southwest Higgins | |
|
|
The 39th Street/Southwest Higgins project reconstructed an important urban arterial street in south Missoula. This project involved designing a complete street by widening the street to add a center turn lane, bicycle lanes, curb, gutter and sidewalk. A comprehensive storm drainage system, and sanitary sewer and irrigation main improvements were added to the corridor. This required complex utility coordination to install a large diameter storm drain in an existing urban right-of-way. WGM Group provided project management, design, right-of-way acquisition, bidding and construction administration services for the project. This was one of the first large-scale Montana Department of Transportation funded construction projects in the state to be administered by a private consultant. Total construction costs were approximately $10 million, with 11 different funding sources.
|
|
WGM Group, Inc. | 1111 East Broadway | Missoula, MT | 59802 | tel. 406.728.4611 | fax. 406.728.2476 |
||
© 2007 WGM Group, Inc., Missoula, Montana, All Rights Reserved