| Projects |
Environmental |
 |
Peterson Wetland Mitigation
This project provided for mitigation of impacts to wetlands associated with the reconstruction of Montana State Highway 1 between Maxville and Drummond in Granite County, MT. |
 |
Fox Theater Site Remediation
Located adjacent to the Clark Fork River in downtown Missoula, the old Fox Theater site was a prime candidate for redevelopment. |
Facility Planning |
 |
Hellgate Elementary School
The Hellgate School District implemented a Facility Enhancement Plan to improve safety for students on campus by alleviating traffic congestion internal to the campus. |
 |
University of Montana
For over 25 years, WGM Group has been working with the University of Montana on projects ranging from utility mapping to sewer and water main relocations. |
Site Civil |
 |
Rocky Mountain Laboratories
The Rocky Mountain Laboratories in Hamilton, MT is part of the National Institute of Health. WGM Group has provided planning, surveying and design services on numerous projects over the last 12 years. |
 |
Missoula Federal Credit Union
The Missoula Federal Credit Union (MFCU) set itself apart from other Missoula financial institutions by identifying itself as an environmentally responsible business, and as a pioneer of sustainable practices. |
 |
Tremper Shopping Center
Tremper Shopping Center is the home of several large businesses, including Ace Hardware and Albertsons. In 2003. the businesses and site owner saw a need to revitalize this urban shopping center. |
 |
Silvertip Apartments
In 2009, Rocky Mountain Development Group, through the City of Missoula, received a $5 million Federal Neighborhood Stabilization Program award to help build apartments for low-moderate income households. |
Floodplain |
 |
Camp Creek Restoration
This project restored 11,000 feet of stream channel and wetlands on Camp Creek near Sula, Montana. The project was constructed by the Montana Department of Transportation (MDT) as mitigation for impacts associated with the reconstruction of Highway 93 in Sula Canyon. |
|
|
Funding |
 |
Ravalli County Consulting
WGM Group provides professional engineering services on an ongoing basis for Ravalli County. Acting as the Ravalli County consulting engineer through an open contract, we work closely with the Road and Bridge Department, Planning Office... |
|
|
Land Use Planning |
 |
Riverfront Triangle Planning
The Riverfront Triangle represents an important area on the western edge of Missoula’s downtown. Having been home to a variety of uses and structures over the years, it was in need of a new vision. |
 |
Teton Addition at Maloney Ranch
Teton Addition at Maloney Ranch is a development consisting of 314 acres, including single- and mutli-family lots, trails, parks, and open space. |
 |
44 Ranch
Through an intense community approval process, WGM Group guided the 44 Ranch development of 167 acres from its conceptual idea to final design and construction of infrastructure. |
 |
Rolling Glen Ranch
WGM Group earned unanimous approval of their design for Rolling Glen Ranch, a Planned Unit Development (PUD) located in the southern portion of Broadwater County, MT. |
 |
Old Sawmill District
This 46-acre Brownsfield site in the heart of Missoula was formerly occupied by lumber mills and manufacturing operations. WGM Group provided land use planning, public relations, surveying, and engineering... |
|
|
Public Sewer |
 |
Wye Area Sewer System
WGM Group designed and oversaw construction for the Wye Area Sewer System, which provides sewer service to approximately 1,566 acres of industrial, commercial, and residential land northwest of the City of Missoula. |
 |
East Reserve Street Sewer
WGM Group provided project management, design, bidding, and construction administration services for this important Missoula sewer project. |
 |
Southwest Missoula Wastewater Facility
WGM Group provided project management, design, bidding, and construction administration service for this sewer project in the City of Missoula. |
 |
Spring Meadows Sewer
High nitrate levels in the Missoula Valley Aquifer in the Spring Meadows area have caused concern for Missoula County in recent years, sparking the need to study the problem further. |
Public Water |
 |
South Hills Water Supply
WGM Group worked extensively with Mountain Water Company, a privately held water company serving the City of Missoula, to develop a water supply system for the South Hills of Missoula. |
 |
Miller Creek Water Facility Planning
WGM Group provided water facility planning for the City of Missoula’s Miller Creek area, which is served by Mountain Water Company and planned for future growth. |
 |
Grant Creek Water Works
WGM Group provided planning, cost analysis, permitting, design, and construction administration for two independent water systems in the Grant Creek area of Missoula. |
 |
Phantom Hills Water System
WGM Group provided planning, cost analysis, permitting, design, and construction administration for this new public water supply. |
Surveying & Mapping |
 |
University of Montana Interdisciplinary Sciences Building
WGM Group provided civil engineering and land surveying services for several aspects of the site design for this new office, lecture and research facility on the University of Montana campus. |
 |
Lambros Real Estate Office Building
WGM Group provided land surveying and civil engineering services for the new 16,000 square foot Lambros Real Estate office building. |
 |
University of Montana South Campus Survey
This detailed topographic survey covered the parking areas, clubhouse, and approximately one-third of the fairways, rough, and greens of the University of Montana golf course. |
 |
Cave Gulch Aerial Mapping
WGM Group completed mapping of approximately 3,400 acres and orthorectified digital aerial imagery of approximately 10,300 acres in Granite County, Montana. |
 |
Flathead River Area Mapping for Floodplain Delineation
WGM Group performed reconnaissance, survey control layout, cross section data acquisition and hydraulic structure measurements along seven different reaches of six streams and rivers in the Kalispell – Flathead area. |
 |
West Broadway Right-of-Way and Improvements Survey
This project included a GPS static horizontal control network to obtain high accuracy geodetic control points for the project, as well as spirit leveling from National Geodetic Survey benchmarks for project vertical control. |
Transportation |
 |
North Higgins Streetscape
WGM Group provided project management, public
involvement, design, and construction administration for
an ARRA-funded streetscape improvement project. The
end result adds to the downtown pulse, enriching the
shopping and working experience. |
 |
Brooks Street Commercial Corridor Curb and Sidewalk Project
MRA and City of Missoula are working to complete the sidewalk network on the Brooks Street Commercial Corridor and adjacent streets in URD III, also known as Midtown. |
|
2nd Street/US Highway 93 Whitefish
The Whitefish Downtown Business District was originally constructed in early 1900’s. This project will improve traffic flow on U.S. Highway 93 in, around, and through downtown Whitefish... |
|
Miller Creek Road Improvements
In 2007, WGM Group was hired by the City of
Missoula to design Miller Creek Road, which included
a roundabout at a dangerous wye-intersection between
Upper and Lower Miller Creek Road. |
|
Brooks/South/Russell Intersection Improvements
The Brooks/South/Russell intersection is in the heart of Missoula’s Midtown. It is a highly developed urban area with many businesses, residences, and the Missoula County Fairgrounds. |
|
US Hwy 93 Whitefish West
In February 2005, the Montana Department of Transportation (MDT) hired WGM Group, Inc. (WGM) to provide the design for the reconstruction of the US Highway 93 corridor in Whitefish. The US 93... |
|
Madison Street Bicycle/Pedestrian Bridge
Missoula’s Madison Street Bicycle-Pedestrian Bridge adds another important link in the Clark Fork River Trail system, and provides a valuable recreation and transportation asset to the community. Spanning the Clark Fork River ... |
|
US Hwy 93 Hamilton to Victor
WGM Group provided project management and prepared the plans and specifications for the widening of U.S. Highway 93 between Hamilton and Victor. |
|
Missoula Downtown Streets
This project is the first phase in a number of WGM Group design recommendations to strengthen Missoula’s downtown by providing improved pedestrian-oriented street... |
|
|
Visualization |
 |
Northwest Passage Scenic Byway
With the National Scenic Byway and All‐American Road designations, these five communities – Lewiston, Orofino, Kamiah, Kooskia and Grangeville – seek ways to maintain the scenic quality of the region while... |
|
|
Water Resources |
 |
South Missoula Storm Drainage
This project was a culmination of over 20 years of studies and storm water improvement projects to mitigate the flooding of southeast Missoula, Montana. |
 |
Missoula Federal Credit Union LEED Building
A greywater irrigation system designed by WGM Group redistributes collected greywater from sinks and dishwashers in the bank building for use in the landscape drip irrigation around the building's perimeter. |